Perangkat Daftar Periksa Construction Project

PENDAR Application that inspectors and contractors can use to monitor overall construction work at Sinar Mas Land. Starting from before work, during work, and after construction work.

00.

01.Overview

Company

Sinar Mas Land

Duration

Q2-Q4 2023

Role

SPV UI/UX Designer

Platform

CMS and Mobile App

Project Goals

Developing work permit applications to inspect the construction process from the beginning of the work permit application, monitoring, and checklists for work at Sinar Mas Land. From the business side, we want to improve the results of construction work following expected quality standards.

02.Business Problem

Business Problem

As the largest property developer with various projects in Indonesia, of course, paying attention to ongoing construction projects is very necessary.

As the largest property developer with various projects in Indonesia, of course, paying attention to ongoing construction projects is very necessary.

As the largest property developer with various projects in Indonesia, of course, paying attention to ongoing construction projects is very necessary.

As the largest property developer with various projects in Indonesia, of course, paying attention to ongoing construction projects is very necessary.

As the largest property developer with various projects in Indonesia, of course, paying attention to ongoing construction projects is very necessary.

As the largest property developer with various projects in Indonesia, of course, paying attention to ongoing construction projects is very necessary.

In implementing the construction process there are Standard Operating Procedures (SOP) that have been established. However, several stages of work were not carried out following the previous SOP.

In implementing the construction process there are Standard Operating Procedures (SOP) that have been established. However, several stages of work were not carried out following the previous SOP.

In implementing the construction process there are Standard Operating Procedures (SOP) that have been established. However, several stages of work were not carried out following the previous SOP.

In implementing the construction process there are Standard Operating Procedures (SOP) that have been established. However, several stages of work were not carried out following the previous SOP.

In implementing the construction process there are Standard Operating Procedures (SOP) that have been established. However, several stages of work were not carried out following the previous SOP.

In implementing the construction process there are Standard Operating Procedures (SOP) that have been established. However, several stages of work were not carried out following the previous SOP.

Errors in implementing SOPs often impact the final results of the project. We experienced a situation where the completed work did not meet the expected quality standards.

Inappropriate work results can harm a company's reputation and customer confidence, as well as lead to increased costs for repairs or redoing work.

Inappropriate work results can harm a company's reputation and customer confidence, as well as lead to increased costs for repairs or redoing work.

Inappropriate work results can harm a company's reputation and customer confidence, as well as lead to increased costs for repairs or redoing work.

Inappropriate work results can harm a company's reputation and customer confidence, as well as lead to increased costs for repairs or redoing work.

Inappropriate work results can harm a company's reputation and customer confidence, as well as lead to increased costs for repairs or redoing work.

Inappropriate work results can harm a company's reputation and customer confidence, as well as lead to increased costs for repairs or redoing work.

03.User Problem

Why does the work not
comply with the SOP?

We carry out an in-depth understanding of existing Standard Operating Procedures (SOP) and analyze the flow of construction inspections. This aims to find out problems that contractors and inspectors as users may face before we decide to ask them directly.

Image: The final design live in the mobile app

Basic Workflow

Actual Work

Before
Contractor
  • Make preparations for the work area

  • Fill out work permit form

  • Work Permit form is given to the Inspector

Inspector
  • Receive the work permit form that has been filled out by the contractor

  • Review the work authorization form

  • Decide whether a work permit is accepted or rejected

Work Process
Contractor
  • Start work

  • Continue/improve work

Inspector
  • The inspector monitors the contractor's work

  • The inspector fills out the monitoring checklist form

After
Contractor
  • Completed work

  • Notify the inspector that their work is complete

  • If the job is suitable, they will move on to the next work

Inspector
  • Come to the location to check the results of the work

  • Fill out the work checklist form

  • Decide whether the work is complete or needs adjustments

Basic Workflow

Actual Work

Before
Contractor
  • Make preparations for the work area

  • Fill out work permit form

  • Work Permit form is given to the Inspector

Inspector
  • Receive the work permit form that has been filled out by the contractor

  • Review the work authorization form

  • Decide whether a work permit is accepted or rejected

Work Process
Contractor
  • Start work

  • Continue/improve work

Inspector
  • The inspector monitors the contractor's work

  • The inspector fills out the monitoring checklist form

After
Contractor
  • Completed work

  • Notify the inspector that their work is complete

  • If the job is suitable, they will move on to the next work

Inspector
  • Come to the location to check the results of the work

  • Fill out the work checklist form

  • Decide whether the work is complete or needs adjustments

Basic Workflow

Actual Work

Before
Contractor
  • Make preparations for the work area

  • Fill out work permit form

  • Work Permit form is given to the Inspector

Inspector
  • Receive the work permit form that has been filled out by the contractor

  • Review the work authorization form

  • Decide whether a work permit is accepted or rejected

Work Process
Contractor
  • Start work

  • Continue/improve work

Inspector
  • The inspector monitors the contractor's work

  • The inspector fills out the monitoring checklist form

After
Contractor
  • Completed work

  • Notify the inspector that their work is complete

  • If the job is suitable, they will move on to the next work

Inspector
  • Come to the location to check the results of the work

  • Fill out the work checklist form

  • Decide whether the work is complete or needs adjustments

The reason is that there is already an application for the work permit process, even though during the work process and after construction work many people still use paper forms.

We focus on the work process and after-construction work. here are some of the gaps we found:

  1. The monitoring process (work process) and work checklist (after) still use many forms in paper form so they are easily damaged/lost.
  1. The monitoring process (work process) and work checklist (after) still use many forms in paper form so they are easily damaged/lost.
  1. There is no container to accommodate all defects/quality non-conformities during the work process, so the construction repair process still has to be done manually.
  1. There is no container to accommodate all defects/quality non-conformities during the work process, so the construction repair process still has to be done manually.

04. Validation The Problem

Qualitative Research

We conducted qualitative research with contractors and inspectors at Sinar Mas Land to understand their behavior and find out more about problems from the work permit process to the completion of construction work.

Key Findings

The following are some of the main findings of the research. We also discovered findings that we did not expect before and this also affected the efficiency of the construction process.

  1. The form used is easily scattered

First, we dig deep into the forms that users currently use to perform monitoring checks as well as job checks.

We found that there were three project conditions, in the construction work process. Here are the details:

  1. Projects that only have one work permit form, monitoring checklist form, and work checklist form.

#usually in the improvement process.

#usually in the improvement process.

#usually in the improvement process.

  1. Projects that have more than one work permit form, monitoring checklist form, and work checklist form.

#usually in the new creation process

#usually in the new creation process

#usually in the new creation process

  1. Projects that correlate with one project and another, have more than one work permit form, monitoring checklist form, and work checklist form.

#usually in new construction processes that have several floors

#usually in new construction processes that have several floors

#usually in new construction processes that have several floors

The second and third conditions are what often cause forms to be scattered because there are many forms used in one project.

  1. There is no container to accommodate all defects/quality non-conformities

On this issue, we dug deeper because this issue risks increasing project costs and slowing down project completion.

We found that there were several factors that caused defects/quality non-conformities.

  1. The quality of the materials used does not comply with established standards.

  1. The quality of workmanship is not up to standard

  1. Errors in implementing established quality standards

In a work checklist form, you need to pay attention to several things such as size, thickness, and strength. This may result in one form having more than one quality defect/nonconformity.

This very small container can only provide written information and there is no documentation of defects/nonconformity in existing records.

  1. There is continuity of one work with another work.

This finding is something that we did not initially anticipate and we discovered during the research process, namely that the project was in condition 3 in the construction process above.

The third requirement is, "Projects that are correlated with one project and another, so that they have more than one work permit form, monitoring checklist form, and work checklist form.

With so many work permit processes that must be gone through and forms collected in one project, the implementing contractor must bring all the forms from the first project as proof that the work has been completed and is ready to continue the next work.

Then the inspector checks forms from previous projects before finally granting permission. This slows down the overall project completion process

05. Goal

Project Goal

After going through a series of research processes to ensure that we are solving the right problem.

Our goal is to design the ideal experience for the entire construction process from initial work permit application to handover by developing current work permit applications.

Before being fully used by all Sinar Mas Land contractors and inspectors, we validated the design with user ability testing.

Image: The final design live in the website

User Goal

We set the user goals as contractors as executors, inspectors as examiners of the results of the contractor's work, and admins as data managers.

  1. Contractor
  • Understand how to process requests for monitoring checklists and work checklists in trials quickly.

  • Work comfortably without having to think about a lot of forms

  • Review non-compliant work easily and quickly to understand

  1. Inspector
  • Review work permit requests, monitoring checklists and incoming work checklists quickly

  • Fill the monitoring checklist forms and work checklists easily

  • Provide review results or findings with documentation

  1. Admin
  • Recapitulate all construction work processes easily and quickly

06. Solution

Structure Data

Before designing the solution, we began to observe the existing data structure in the work permit application and the new data structure in the current job checklist process. We discuss it with other stakeholders (Analysts & Developers) to keep us aligned.

The data mapping image below shows the data structure that will be used for the construction contractor process which is expected to overcome problems in the process, as well as increase efficiency, effectiveness, accuracy, ease of access, and security.

07. Flowchart Diagram

The trail users traverse

Imagining the current flow, we try to translate the existing flow into something that is easier to understand. In the purple box, this is the process monitoring checklist and job checklist. Meanwhile, the white box is the flow in the current work permit application.

Kontraktor

Kontraktor

SM/PM Kontraktor

SM/PM Kontraktor

Inspektur SML

Inspektur SML

PM SML

PM SML

08. Low fidelity

Sharing ideas and gathering early feedback

A simplified version of the final product that is used to plan and communicate the structure and functionality of the user interface. This helps designers and stakeholders understand user interactions and content pages.

A simplified version of the final product that is used to plan and communicate the structure and functionality of the user interface. This helps designers and stakeholders understand user interactions
and content pages.

A simplified version of the final product that is used to plan and communicate the structure and functionality of the user interface. This helps designers and stakeholders understand user interactions
and content pages.

A simplified version of the final product that is used to plan and communicate the structure and functionality of the user interface. This helps designers and stakeholders understand user interactions
and content pages.

  1. The form used is easily scattered

First, we outline the layout and flow of information present in the current form. so that later users can more easily understand the form.

We immediately divide the data according to the form type, here I only use one form for the job checklist as a representative because the process for adding forms is the same for each form type.

Each form has different categories and subcategories and different conditions, so we make it easy for users to adapt the form to their needs.

After they have finished filling in all the information based on the previous manual form, we display a preview that they can see on the website.

We also group them according to categories in card form on the cellphone display, so that it is easier for users to scan the form to be filled out.

  1. There is no container to accommodate all defects/quality non-conformities

We attach defects/quality nonconformities to each sub-category so that the documentation can be easily found later when it is needed again.

When the "Rejected" Radio Button is Active, the Card will change. So users need to add documentation and notes to document quality nonconformities.

We made the Button automatically change to "Rejected" if one of the subcategories is rejected by the inspector. This aims to reduce errors in inputting forms and reduce the risk of rework.

  1. There is continuity of one work with another work.

Before we create a continuity of work from one another, we need to create a data mapping so that the sequence can stick to the floor first. Sequence is the name for the Work Permit Form, Employment Checklist Form, and Monitoring Checklist Form combined into one. Each floor has its uniqueness, so there can be several Sequences on one floor.

Once we have the data, let's provide continuity or conditions so that the continuity of this work can be easily accessed by contractors via Smartphone.

Bundle requirements function to provide conditions so that the continuity of work is automatically arranged at the beginning, while the Sequence is part of the bundle's requirements that must be completed before they can continue work to the next floor.

So inspectors and contractors no longer need to worry about what requirements they have to complete first and collect forms manually again to fulfill the requirements for the next job.

Bundle requirements function to provide conditions so that work continuity is automatically arranged at the beginning, while Sequence is part of the bundle requirements that work must be completed before they can continue work to the next floor.


So inspectors and contractors no longer need to worry about what requirements they have to work on first and collect forms manually again to fulfill the requirements for the next job.

Bundle requirements function to provide conditions so that work continuity is automatically arranged at the beginning, while Sequence is part of the bundle requirements that work must be completed before they can continue work to the next floor.


So inspectors and contractors no longer need to worry about what requirements they have to work on first and collect forms manually again to fulfill the requirements for the next job.

Bundle requirements function to provide conditions so that work continuity is automatically arranged at the beginning, while Sequence is part of the bundle requirements that work must be completed before they can continue work to the next floor.


So inspectors and contractors no longer need to worry about what requirements they have to work on first and collect forms manually again to fulfill the requirements for the next job.

Mapping data changes also impact contractors in their applications. When contractors want to apply for a work permit, they only need to determine the floor they want and do not need to repeatedly apply for a work permit.

Before

In the current work permit application, the work permit application is made in only one work permit form. There is no checklist for monitoring applications, work checklists, and floor selection for proposed work permits.

After

Now, each form has been directly mapped to each floor so that users do not need to repeatedly apply for work permits and we also provide continuity between one work permit and another through the system.

After they submit their work permits, they will get several work permits at once on their screen. We provide conditions for work permits to be completed one by one so that the order of work remains by previously established standards.

After they submit their work permits, they will get several work permits at once on their screen. We provide conditions for work permits to be completed one by one so that the order of work remains by previously established standards.

After they submit their work permits, they will get several work permits at once on their screen. We provide conditions for work permits to be completed one by one so that the order of work remains by previously established standards.

After they submit their work permits, they will get several work permits at once on their screen. We provide conditions for work permits to be completed one by one so that the order of work remains by previously established standards.

  1. Other designs

We also create several designs to support the product so that it continues to be used from start to finish. which we will later bring to the user validity ability process.

We divide them according to the user stories that we have previously created, to make it easier for us and the developers to see how each user story flows.

09. Validation

Round of Usability Testing

As a next step to ensure whether the design created is suitable for users or not, we carry out usability ability testing online.

  1. The form used is easily scattered

Format and layout of information in a new form that is easy for users (inspectors) to understand at the stage of creating and reviewing the results of forms that have been created.

  1. There is no container to accommodate all defects/quality non-conformities

Users (inspectors) can easily understand the situation when one of them is rejected and documentation of defects/nonconformities appears in that subcategory. They also understand that the form will be automatically rejected if one of the subcategories is rejected.

  1. There is continuity of one work with another work.

Design and flow for making work permit continuity requirements, easy for inspectors to understand. Contractors understand that they no longer need to think about the continuity of work permits because they are already available.

10. Supporting Media

Promote & Guide

Poster

in this project, we also created a poster to help raise awareness for contractors and inspectors that we have developed an application that will help with their work.

User Guide

Not only do posters increase awareness, but we also create user guides to help them better understand each function in the products we have developed.

11. Epilog

Result & Impact

Because this product is still under development, we cannot provide figures as a form of our achievements. But we have determined what matrix we will use later.

  • On-time Project (Time)

  • Reduce Re-Work Cost (Money)

  • Maintain Quality (Quality)

Key Takeaway & Learning

  • Working on projects related to construction made me learn a lot about seeing and determining possible events in the field during the research process.

  • Not only possible events, I learned to create very complex mapping data with different conditions. This makes me have to sharpen my logic so that the data still makes sense for us or developers.

  • Supervising a project is something new for me. I learned how to be more understanding and more critical of team members, learning to process technical language into language that is easier for the team to understand is a very interesting lesson for me.

  • Not only did I supervise projects, but I also learned to supervise 3 parallel projects running at once, I learned how to manage different teams and projects and track their work so that it remains on target and aligned with stakeholders.

  • Having a team with different projects means that I have to understand what difficulties and obstacles the team faces and help with whatever it is, answering doubts, finding solutions to the problems faced, and providing encouragement.

Other Project

Design System - Property Management Apps
Sinar Mas Land
2023

->

Design System - Property Management Apps
Sinar Mas Land
2023
Design System - Property Management Apps
Sinar Mas Land
2023
Dynamic Price
Grupee Indonesia
2023

->

Dynamic Price
Grupee Indonesia
2023
Dynamic Price
Grupee Indonesia
2023

Contact

Let's talk

I'm available for new opportunities

Contact

Let's talk

I'm available for new opportunities

Contact

Let's talk

I'm available for new opportunities

Contact

Let's talk
I'm available for new opportunities

Contact

Let's talk

I'm available for new opportunities

Contact

Let's talk

I'm available for new opportunities